Retry with backoff and jitter
Repeat failed idempotent calls while the deadline allows.
Strengths
- Rescues transient failures.
Weaknesses
- Can multiply load during outages.
Choose it when
- Idempotent calls, spare deadline, and a retry budget in place.[1] Addressing Cascading Failures (Site Reliability Engineering), Secondary, Not yet verified by an editor
Limitations
- Unsafe for non-idempotent writes without idempotency keys.